Airbus A380 (Wallpaper 2)
Tuesday, March 15, 2011image dimensions : 1200 x 749
Airbus A380 (wallpaper 2). Airbus A380 aircraft images wallpaper gallery 2. Airbus A380 aircraft pictures collection 2. Initial production of the A380 was troubled by delays attributed to the 530 km (330 mi) of wiring in each aircraft. Airbus cited as underlying causes the complexity of the cabin wiring (100,000 wires and 40,300 connectors), its concurrent design and production, the high degree of customisation for each airline, and failures of configuration management and change control. Specifically, it would appear that German and Spanish Airbus facilities continued to use CATIA version 4, while British and French sites migrated to version 5. This caused overall configuration management problems, at least in part because wiring harnesses manufactured using aluminium rather than copper conductors necessitated special design rules including non-standard dimensions and bend radii; these were not easily transferred between versions of the software. Airbus A380 (wallpaper 2) Airbus A380 aircraft images wallpaper gallery 2. Airbus A380 aircraft pictures collection 2.
Airbus announced the first delay in June 2005 and notified airlines that deliveries would be delayed by six months. This reduced the total number of planned deliveries by the end of 2009 from about 120 to 90–100. On 13 June 2006, Airbus announced a second delay, with the delivery schedule undergoing an additional shift of six to seven months. Although the first delivery was still planned before the end of 2006, deliveries in 2007 would drop to only 9 aircraft, and deliveries by the end of 2009 would be cut to 70–80 aircraft. The announcement caused a 26% drop in the share price of Airbus's parent, EADS, and led to the departure of EADS CEO Noël Forgeard, Airbus CEO Gustav Humbert, and A380 programme manager Charles Champion. On 3 October 2006, upon completion of a review of the A380 program, the CEO of Airbus, Christian Streiff, announced a third delay, pushing the first delivery to October 2007, to be followed by 13 deliveries in 2008, 25 in 2009, and the full production rate of 45 aircraft per year in 2010. The delay also increased the earnings shortfall projected by Airbus through 2010 to €4.8 billion Airbus A380 (wallpaper 2) Airbus A380 aircraft images wallpaper gallery 2. Airbus A380 aircraft pictures collection 2.
Airbus A380 (Wallpaper 1)Airbus announced the first delay in June 2005 and notified airlines that deliveries would be delayed by six months. This reduced the total number of planned deliveries by the end of 2009 from about 120 to 90–100. On 13 June 2006, Airbus announced a second delay, with the delivery schedule undergoing an additional shift of six to seven months. Although the first delivery was still planned before the end of 2006, deliveries in 2007 would drop to only 9 aircraft, and deliveries by the end of 2009 would be cut to 70–80 aircraft. The announcement caused a 26% drop in the share price of Airbus's parent, EADS, and led to the departure of EADS CEO Noël Forgeard, Airbus CEO Gustav Humbert, and A380 programme manager Charles Champion. On 3 October 2006, upon completion of a review of the A380 program, the CEO of Airbus, Christian Streiff, announced a third delay, pushing the first delivery to October 2007, to be followed by 13 deliveries in 2008, 25 in 2009, and the full production rate of 45 aircraft per year in 2010. The delay also increased the earnings shortfall projected by Airbus through 2010 to €4.8 billion Airbus A380 (wallpaper 2) Airbus A380 aircraft images wallpaper gallery 2. Airbus A380 aircraft pictures collection 2.
Airbus A380 (Wallpaper 3)
Airbus A380 (Wallpaper 4)
Labels: Airbus A380
|
<< Home